BRIC One-Pager — Del Norte County, CA

Application target: FEMA BRIC FY2026 · Deadline: 2026-07-23 (3:00 PM ET) · Generated: 2026-08-18T13:37:20Z
Source data: Firewatch fire-risk model (4 km grid), WFIGS active incidents, US Drought Monitor.

This county ranks at the 94.4th percentile of corridor-wide fire risk within 60 km of its centroid. Recommended as a priority candidate for FY2026 BRIC investment.

Risk profile

MetricValue
Max corridor-percentile risk (60 km radius)94.4th percentile
Mean risk (60 km radius)0.519
Cells sampled21
Centroid41.7499, -123.9810

The Firewatch model fuses gridMET climate, LANDFIRE fuels, SNOTEL/SNODAS snowpack, and FPA-FOD ignition history into a per-cell fire-probability score. The figures above are corridor-relative, not absolute probabilities; pair with local fuels and fire-history data before sizing a treatment program.

Active fire context (as of 2026-08-18T13:37:20Z)

FireStateAcres% Cont.Distance (mi)
MP18CA6,91419%45.2

Recommended BRIC application categories